

30 Days Lowest Price Guarantee
Western Art Ceramic Tile Mural Backsplash - Behind Schedule by Jack Sorenson (24" x 32" - 8" tiles)
SIZE
24" x 32" - 8" tiles
12.75" x 17" - 4.25" tiles
18" x 24" - 6" tiles
DESCRIPTION
Features the artwork Behind Schedule by Jack Sorenson. Turn a plain space into an unbelievable focal point with one of these Fine Art tile murals. Produced on our high quality ceramic tiles, which have a satin surface. The artwork is infused into the tile and will not rub off. Suitable for interior use only. Great for a backsplash, behind a stove, in a shower, or other interior spaces. Install using standard tile adhesive and grout. Easy to follow installation guidelines included. Also available on glass and tumbled marble, and floor tiles. NOT rated for floors, countertops, or other high abrasion locations.
- Ceramic Tile Mural on High Quality Tile w/Satin Finish
- Suitable for a backsplash, behind a stove, shower, wall, interior spaces
- Fusion Imaging Process imbeds artwork into tile surface; waterproof, fade resistant
- Individually handcrafted. Produce with highest quality materials and craftsmanship
- Made to Order in USA